Latest News
  • Our office opening hours for our Western Way office are

    10 am – 12 noon and 2.30 pm – 4.30pm.

     

     

Planned Investment Programme

Planned improvements for 2026/27

84 Kitchen replacements
16 Bathroom replacements
17 Properties receiving new windows
10 New fire door installations
20 New front or rear door replacements
6 Properties receiving new storage heaters
65 Boiler replacements
1 New high-security car park gate with remote access
4 Blocks of flats receiving new communal entrance doors and a new access control system
Additional net zero improvement works to properties below EPC C, including: Loft insulation; New extractor fans; Cavity wall insulation; Solar panel installations; Other energy-efficiency measures
Lintel and door canopy replacements at Barley Mount
Repairs to the external wall at Rockfield House
Replacement of balcony decking’s at Phoenix Court

Improvements completed in 2025/26

  • Four Cornerstone colleagues in work clothes standing together on grass in front of a terrace of brick houses

    Kitchen renewals

    • 35 renewed kitchens
  • An operative wearing a dust mask working at an opening in a wall that has been stripped back for refurbishment

    Bathroom renewals

    • 47 renewed bathrooms
  • An operative in a hi-vis vest and ear defenders reaching overhead to work on a doorway stripped back to the brickwork

    Window renewals

    • 64 Homes with new windows
  • A Cornerstone colleague using a cordless drill on a white frame outside a rendered home, with a ladder propped beside him

    Door replacements

    • 10 Front/rear doors
    • 6 Fire doors
    • 7 Communal doors and entry systems
  • Cornerstone engineer in a white branded polo shirt working on the copper pipework beneath a wall mounted boiler

    Boiler replacements

    • 32 boilers replaced
  • Cornerstone colleague in a black branded polo shirt holding a tablet outside a row of houses with front gardens

    Energy efficiency improvements

    • 126 homes received net zero works. These included loft insulation and low energy lighting. These works help save customers money spent on heating/running their homes.
    • 2 Home storage heaters
    • 1 Air Source Heat Pump (ASHP) installation complete
Page last updated: 7th October 2026